In order to handle the next generation of drilling operations, we must be creative!
HTV movement of standlifter
Pipes to wellcenter
Handling of baskets on pipedeck         
Hydraulic  vertical lifters  on pipedeck working inside the baskets lifts pipes to the Standlifter slots where they are secured by Standlifter locking arms

Technology

The Standlifter derrick end trolley runs vertically on guiderails in the derrick V-door side. The Standlifter front end runs on horizontal rails elevated from pipedeck. This secures a smooth HTV operation with all  the pipes protected. The operation is winch driven.
The baskets on pipedeck are handled by a knuckleboom crane with a hydraulic yoke. The pipedeck is unmanned
The two Standlifters and Wellcenter forms cornes in a triangel. A vertical piperacker in center of this triangel is used for pipe transfer between the Standlifters and wellcenter. Because of the geometry, no horizontal travel of the racker is necessary.
Magnum Standlifter
The new pipehandling system by Standlifter Holding AS
Pipe transfer between basket and standlifter